Project : Hengrove Bookends

Client : Hills Construction

Project Type : Multi Storey Residential New Build

Duration : 12 months

Location : Bristol

Our team was proud to deliver the full masonry package for the Bookends development in Hengrove. The project featured striking glazed blue bricks, which were carefully laid to create a bold and modern façade. We also incorporated a variety of feature panels, adding architectural interest and enhancing the visual appeal of the building.

Description

In addition to the brickwork, we installed the insulation system, Ancon channels, and a robust masonry support system to ensure long-term structural integrity. Our scope also included the provision of forklift drivers, supporting efficient site logistics and material handling throughout the build.


Project : Katherine Lady Berkeley School

Client : Kier Construction

Project Type : New build secondary school

Duration : 24 months

Location : Gloucestershire

We were appointed to carry out the masonry works across four new buildings at Katherine Lady Berkeley School, including the main school building, sports hall, and two extension blocks. The project involved a variety of feature panels that added architectural depth and complemented the clean, modern brickwork throughout the site.


Project : Trinity Road

Client : Hills Construction

Project Type : Multi Storey Residential New Build

Duration : 12 months

Location : Bristol

We’re currently delivering the full brickwork package for the Trinity Road development, a scheme of affordable homes for our repeat client, Hill Group. The project involves the installation of nearly 500,000 bricks, spread across multiple blocks and elevations, requiring careful sequencing and coordination with other trades.

Description

Our scope includes all associated masonry works, with a focus on maintaining high standards of workmanship and consistency across the site. As a large-scale residential development, the project highlights our capacity to deliver volume brickwork efficiently while meeting programme targets and quality expectations.


Project : Crescent Centre

Client : Kier Construction

Project Type : Commercial refurbishment

Duration : 18 months

Location : Bristol

We undertook a major refurbishment project in the heart of Bristol city centre, delivering a wide range of complex masonry and structural works. A key element of the project involved infilling 115 parapets, requiring precision and coordination across multiple elevations. Internally, we carried out significant structural alterations, adapting the existing layout to meet new design and usage requirements.

Description

The scope also included the construction of new plant rooms and extensive external masonry repairs, restoring the building’s façade while maintaining its architectural integrity. Our team worked closely with other trades to ensure seamless integration of new and existing elements, delivering a high-quality finish across all aspects of the build.


Project : HRE Structures

Client : ECS Hammonds

Project Type : Historic structures maintenance

Duration : Ongoing

Location : Nationwide

As part of the Historic Railway Estates framework, we carry out ongoing maintenance and repair works to a wide range of heritage railway structures across the UK. These projects often involve road closures and the establishment of independent site welfare setups, allowing our teams to operate safely and efficiently in remote or logistically challenging locations.

Description

Our scope includes the rake out and repointing of masonry, using traditional techniques and materials to preserve the character and integrity of these historic assets. We also undertake the rebuilding of damaged or deteriorated sections, ensuring structural stability while maintaining the original appearance of the structures.

Working within this framework requires a sensitive and methodical approach, balancing the demands of modern safety standards with the need to protect and conserve the UK’s historic railway infrastructure.


Project : Infrastructure Services

Client : Network plus

Project Type : Infrastructure repair works

Duration : Ongoing

Location : Nationwide

Our team regularly delivers a wide range of infrastructure-related masonry services, supporting essential upgrades and emergency repairs across commercial and public sector sites. This includes the removal and rebuilding of walls to accommodate new electrical installations, ensuring safe and efficient integration with existing structures.

Description

We also carry out repairs to damaged building fabric following emergency works, restoring structural integrity and visual consistency. Our scope often includes the removal and reinstatement of driveways and footpaths, maintaining access and surface quality while coordinating with other trades to minimise disruption.


Project : Elm Park Primary School

Client : BAM

Project Type : New build primary school

Duration : 4 months

Location : South Gloucestershire

We were appointed to deliver the full masonry package for the new-build Elm Park Primary School, constructed on a timber frame structure. The project featured a vibrant combination of yellow and blue bricks, carefully selected to reflect the school’s identity and create a welcoming, modern façade.

Description

Our team worked closely with the main contractor to ensure seamless integration of the brickwork with the timber frame, maintaining precision and consistency across all elevations. A number of feature panels were incorporated into the design, adding visual interest and breaking up the façade with contrasting textures and colours


Project : Bassaleg School

Client : Willmott Dixon

Project Type : New build secondary school

Duration : 4 months

Location : Newport

We delivered the masonry package for Bassaleg Secondary School with Willmott Dixon, including feature brickwork across multiple blocks. The project ran over 12 months with phased handovers. Key challenges included working on a live school site and coordinating with multiple trades. Our team maintained high standards throughout while meeting programme deadlines


Project : South Bristol Youth Zone

Client : Galliford Try

Project Type : New build community youth facility

Duration : 3 months

Location : Bristol

R&R were proud to deliver this key community project with Galliford Try. The timescales were tight and there was a lot of media attention on the project which meant that achieving a great finish was crucial. The project involved a feature blockwork wall which was to be turned into a large scale murial as well as a number of lift shafts, external walls and finish brickwork


Project : Mary Hare School

Client : Beard

Project Type : New build SEN School

Duration : 6 months

Location : Newbury

We delivered the full brickwork package for Mary Hare School, a specialist SEN facility for deaf children. The nature of the school introduced unique challenges around site coordination, safeguarding, and noise control, requiring a sensitive and well-managed approach. A key feature of the build was the extensive use of curved brickwork, with large sections constructed on a radius, demanding precision and craftsmanship.

Description

In addition to the brickwork, our team installed the insulation, Ancon channels, and masonry support systems, ensuring structural integrity and thermal performance throughout. The project showcased our ability to deliver complex masonry works to a high standard while adapting to the specific needs of a specialist education environmen


Project : House of Fraser

Client : ISG

Project Type : Commercial refurbishment

Duration : 9 months

Location : Cwmbran

We were engaged to carry out extensive masonry works as part of the refurbishment of the former House of Fraser building in Cwmbran. The project involved a significant number of masonry infills and structural repairs, requiring careful coordination and attention to detail to integrate seamlessly with the existing structure.

Description

A key aspect of the works was the replacement of failing cavity wall ties. We used Helifix remedial ties to stabilise the masonry and restore structural integrity without the need for full wall reconstruction. This approach provided a cost-effective and minimally invasive solution, ensuring long-term durability while preserving the building’s original fabric.


Project : Wates

Client : Addison House

Project Type : Community Living

Location : Cardiff

Addison House is one of Cardiff Council’s new state of the art Community Living schemes. The accommodation consists of 44 x 1 or 2 bedroom flats on 5 floors. This project consisted of two types of colour brickwork and contained numerous complex details regarding the fire stopping and balconies.


Project : Kier

Client : Dentistry School

Project Type : Medical refurbishment

Location : Bristol

This was another commercial refurbishment project for a repeat client in Bristol city centre. Like all refurbishment projects the working conditions and general logisitics were challenging. Due to our substainial experience in completing refurbishments projects were we able to produce an excellent final product within the programme.


Project : Braithwaites

Client : Home Bargain

Project Type : Commercial

Duration : 6 weeks

Location : Newport

Like most commercial projects the programme was aggressive but we were able to lay 72,000 blocks in under 6 weeks to complete this project a week earlier than programmed. The external walls were finished with staffordshire blue bricks and coloured mortar to complete the look


Project : Vinci

Client : Sulis Hospital

Project Type : Medical new build

Duration :

Location : Bath

The Sulis Hospital project consisted of a number of small external buildings to house plant equipement and generator rooms as well as gernal Builder Work In Connection items. It was great to be able to contribute to building a much needed community resource for a new client